Minor Capital Outlay Projects 2005/2006

Priority Projects Location/Space Type Project Cost Cumulative Cost
1

A/C Installation in BATS Laboratory:

This project will solve temperature problems with the installation of a new A/C system in the BATS Lab In Amador Hall.

Amador Hall,

Room 220
$75,000.00
$75,000.00
2 Criminal Justice Remodel: Create adequate meeting space for the Division of Criminal Justice. Project to include removal of walls, sink and counter, relocation of cabinets, new sink and counter installation, new carpeting and paining. New furniture and the installation of electrical and data outlets to be included. Alpine Hall, Rooms 154, 154A, and 154B.
$46,500.00
$121,500.00
3 ADA Corrections: 1) replace door in Brighton Hall, 2) replace ADA lift in Shasta Hall, 3) replace ADA lift for pool

Brighton Hall, Room 133;

Shasta Hall,

Pool
$28,500.00
$150,000.00
  Campus Total Allocation Request    
$150,000.00